Arc by Crown, Sydney

Arc by Crown

New form defines Sydney’s City Skyline

Client

Crown International

Location

Sydney, Australia

Year Completed

2018

Project Value

A $250M

Construction Company

Hutchinson Builders

Arc by Crown is an iconic mixed use development, an architectural statement, one that changed the Sydney skyline. Designed by Koichi Takada Architects, Arc by Crown is situated in the heart of Sydney and features a striking design incorporating heritage-inspired lower levels transitioning to a modern glass-and-steel tower, capped with a number of steel arches. The building incorporates multiple levels of basement carparking, two levels of retail and a combination of serviced and owner occupied apartments with a rooftop terrace.

Holmes provided Building Code of Australia (BCA) advice in the early stages of the project to identify potential non-compliance with the Deemed-to-Satisfy Provisions and areas where Fire Engineering could add value to the design. This enabled the design team to submit a bold design to council for Development Application approval, with the confidence that significant BCA non-compliances had been identified with a strategy in place to justify Alternative Solutions.

Arc by Crown contains a number of unique features that required Holmes to develop innovative, yet practical fire engineering solutions whilst still maintaining an acceptable level of fire safety. One example is the glass lift shaft connecting all above ground storeys, providing spectacular views to the north. The BCA prescriptive provisions require this shaft to be of masonry construction however, by providing a suite of subtle fire safety features, in-keeping with the architectural intent of the building, Holmes Fire was able to demonstrate that fire spread via the lift shaft would be mitigated, permitting the architecturally significant centrepiece glazed lift design to be embraced as a fire protected feature.

The design also incorporates natural ventilation for a number of the apartments. Holmes was able to develop a fire safety solution that enabled open windows in the fire rated walls between the apartments and the common corridors. This provides bright and airy living spaces that would not have been achievable under the BCA Deemed-to-Satisfy Provisions.

Other Alternative Solutions provided by Holmes included:

  • Extended travel distances
  • Omission of stair re-entry facilities
  • Location of the fire brigade booster
  • Omission of sprinklers from cupboards and concealed spaces
  • Provision of natural smoke ventilation to the through site link

Throughout this project, Holmes worked closely with the client, architect, services engineers, fire brigade, builder and project certifier to help identify fire safety issues, develop cost effective, practical and aesthetically achievable solutions which ultimately meet the design objectives whilst achieving suitable levels of fire safety for the building’s occupants and fire brigade personnel.